CHAPTER 9. BUILDINGS.*
Sec. 9-50.78. Definitions.
The following terms shall mean:
(a) "New development" includes:
(1) New construction which generates additional traffic
impacts to those generated by the previous use of the land;
(2) Conversion of one use to a new use when the new use
generates an additional traffic impact;
(3) Expansion of an existing use, except any addition or
modification to a single-family dwelling if the proposed addition or
modification will not change the use or character of the building as a
single-family dwelling;
(4) Any use when conditions imposed by a discretionary permit
require payment of a traffic fee.
(b) "Off-site" means anything outside and not adjacent to the
boundaries of a development.
(c) "Traffic improvements" includes transportation planning,
preliminary engineering, environmental impact reports, engineering design
studies, land surveys, right-of-way acquisitions, engineering, issuance of
permits and construction of all the necessary features for any street
construction project, including, without limitation:
(1) Construction of new streets;
(2) Construction of new through lanes;
(3) Construction of new turn lanes;
(4) Construction of new bridges;
(5) Construction of new drainage facilities in conjunction
with street or bridge construction or improvement;
(6) Purchase and installation of traffic signalization
(including new and upgrading signalization);
(7) Construction of curbs, medians, and shoulders;
and
(8) All street and intersection capacity enhancements,
including extensions, widening, intersection improvements, and improvement of
pavement conditions. (Ord. No. 2034 (NCS), § 1; Ord. No. 2156 (NCS), §
1.)