CHAPTER 30. STREETS AND SIDEWALKS.*
Article I. In General.
Sec. 30-1. Obstructions generally prohibited; exceptions.
Sec. 30-1.1. Summary removal of obstructions.*
Sec. 30-1.2. Recovery of costs for removal of obstructions.
Sec. 30-2. Displays of merchandise on sidewalks.
Sec. 30-3. Riding animals on sidewalk prohibited.
Sec. 30-4. Spitting on sidewalk prohibited.*
Sec. 30-5. Destroying, etc., monuments.
Sec. 30-6. Repealed by Ordinance No. 1392 (NCS).
Sec. 30-7. Repealed by Ordinance No. 1392 (NCS).
Sec. 30-8. Trains -- Not to obstruct streets.
Sec. 30-9. Same -- Speed regulated.
Sec. 30-10. When barriers, etc., required.
Sec. 30-11. Overgrown trees and shrubs -- Prohibited.*
Sec. 30-12. Same -- Removal by city.
Article I-A. Parade Regulations.
Sec. 30-12.1. Parade permit required.
Sec. 30-12.2. Permit application.
Sec. 30-12.3. Time of filing application.
Sec. 30-12.4. Standards for issuance.
Sec. 30-12.5. Notification by city manager.
Sec. 30-12.6. Appeal to city council.
Sec. 30-12.7. Contents of permit.
Sec. 30-12.8. Conduct of permittee.
Sec. 30-12.9. Revocation of permit.
Sec. 30-12.10. Peddlers and hawkers prohibited on parade route.
Sec. 30-12.11. Violations; penalties.
Article I-B. Regulations for Temporary Closing of Streets.
Sec. 30-12.20. Permit required for temporary street closing.
Sec. 30-12.21. Permit application.
Sec. 30-12.22. Time of filing application.
Sec. 30-12.23. Standards for issuance.
Sec. 30-12.24. Notification by city manager.
Sec. 30-12.25. Appeal to city council.
Sec. 30-12.26. Contents of permit.
Sec. 30-12.27. Conduct of permittee.
Sec. 30-12.28. Revocation of permit.
Article II. Excavations.
Sec. 30-13. Permit -- Required; exception.*
Sec. 30-14. Same -- Application.
Sec. 30-15. Same -- Bond may be required.
Sec. 30-17. Work to be done by city in case of unreasonable delay; costs.
Sec. 30-18. Waiver of application for permit in cases of emergency.
Article III. Construction of Street Pavement, Tie-in Pavement, Sidewalks, Curbs and Gutters.
Sec. 30-19. Repealed by Ordinance No. 1392 (NCS).
Sec. 30-20. Permit -- Required.*
Sec. 30-21. Same -- Application.
Sec. 30-22. Same -- Conditions for issuance.
Sec. 30-23. Same -- Bond may be required.
Sec. 30-25. Design to be approved by city engineer.
Sec. 30-26. Work to comply with city standards and specifications.
Sec. 30-27. Procedure upon rejection of work by superintendent of streets.
Article IV. Parkway Paving.
Sec. 30-29. Permit -- Required; reservation of right to revoke by council.*
Sec. 30-30. Same -- Application; conditions of issuance.
Sec. 30-31. Same -- Exception; maximum paving permitted; tree basins.
Sec. 30-32. Location of street trees; tree fee.
Sec. 30-33. Permissible materials; grading.
Sec. 30-34. Parkway paving committee established to grant variances.*
Article V. Encroachments.
Sec. 30-35. "Encroachment" defined.
Sec. 30-36. Permit -- Required; exception.*
Sec. 30-37. Same -- Application; certain acts prohibited without permit.
Sec. 30-39. Same -- Conditions; approval by certain agencies.
Sec. 30-40. Same -- Bond may be required.
Sec. 30-41. Same -- Permittee to hold city harmless.
Sec. 30-42. Same -- Revocation; time for compliance with revocation.
Sec. 30-44. Holder subject to orders of superintendent of streets.
Sec. 30-45. Depth, location, etc., of water and gas mains.
Sec. 30-46. Applicability of article to annexations.
Sec. 30-47. Noncomplying encroachments -- Declared nuisance.
Sec. 30-48. Same -- Summary removal.
Sec. 30-49. Same -- Same -- Recovery of costs; penalty.
Sec. 30-50. Same -- Same -- Expense to be a lien.
Article VI. Underground Installations.
Sec. 30-52. Public hearing required.
Sec. 30-53. Ordinance for removal of overhead structures and underground installation.
Sec. 30-54. Prohibited acts when removal ordered -- Generally.
Sec. 30-55. Same -- Exceptions -- Emergencies, etc.
Sec. 30-56. Same -- Same -- Certain municipal equipment.
Sec. 30-57. Same -- Same -- Continuous lead wires, radio antennas, service terminals, etc.
Sec. 30-58. Notice to remove poles to be given.
Sec. 30-59. Responsibility of utility company.
Sec. 30-60. Notices -- To owner to provide underground connections.
Sec. 30-63. Performance of work by city upon failure of owner to comply with notice; assessment.
Sec. 30-64. Notice of assessment of costs.
Sec. 30-65. Hearing of protests of assessment.
Sec. 30-66. Assessment to be a lien.
Sec. 30-67. Responsibility of city to remove city equipment from poles.
Sec. 30-69. Alternative procedure for assessment.
Sec. 30-70. Same -- Jurisdiction; right of entry, etc.
Sec. 30-70.5. Undergrounding required -- Certain streets.
Article VII. Official Plan Line Regulations.
Sec. 30-71. Declaration of purpose.
Sec. 30-73. Construction or enlargement of improvements prohibited.
Sec. 30-74. Conflicting permits or licenses void.
Sec. 30-75. Hearing by planning commission.
Sec. 30-76. Recommendation to council.
Sec. 30-77. Hearing by council.
Sec. 30-78. Amendment or rescission of official plan line.
Sec. 30-79. Map identification and certification.
Sec. 30-81. Deposit of copies of maps with city engineer.
Sec. 30-82. Variances -- Authority -- Grounds.
Sec. 30-83. Variances -- Procedure.
Sec. 30-84. Variances -- Agreement for removal.
Article VIII. Street Names.
Sec. 30-91. Street naming committee -- Structure.
Sec. 30-92. Street naming committee -- Duties.
Sec. 30-93. Planning commission review.
Sec. 30-94. City council action.
Sec. 30-95. Additional requirements and impacts of resolution adoption.